DISCOVER PROJECT

Urbanest

Art'otel

Hotel | Islington, London

June 2020 - June 2024

The development consists of a 27 storey with 3 and 4 storey linked buildings. It involved the construction of 343 hotel rooms and office spaces, meeting rooms, gym, and plant areas.

SPACES

Hotel, Office Spaces, Meeting Rooms, Gym, Plant Areas

Project Overview

The development consists of a 27 storey with 3 and 4 storey linked buildings. It involved the construction of 343 hotel rooms and offi ce spaces, meeting rooms, gym, and plant areas.

The three-storey basement housing included an art gallery, spa, swimming pool and main plant rooms along with BoH kitchens and staff areas.
The three-storey basement housing included an art gallery, spa, swimming pool and main plant rooms along with BoH kitchens and staff areas.

The project took full advantage of the in-house JRL Group resource, delivering all aspects of the build. meeting rooms, gym, and plant areas - as shown below: • JCE - piling • JRL - basement box, RC Frame, structural steelwork, Wing Block • McMullen - design and coordination of wing block facades GRC Panels supplied by • MDS - The roofs designed by Midgard Design Services GIA: 32,118m2 • Trent Precast - GRC Panels

https://artotellondonhoxton.com/

Have a project?

Schedule a Call.

Let's chat!

Have a project?

THE JRL GROUP
Integrated Construction Solutions
THE JRL GROUP
Integrated Construction Solutions
THE JRL GROUP
Integrated Construction Solutions

Have a project?

Schedule a Call.

Let's chat!

Have a project?

THE JRL GROUP

Integrated Construction Solutions